From Approved Drawings to a Store That's Actually Trading
Fixtures, lighting and signage get built to the approved layout by our own site experts, mall management’s own fit out rules get navigated as part of the schedule, and the store you open is the one that was actually designed, not a version that drifted during construction.
Enzo Interiors has fitted out retail spaces across Dubai since 1995.
30+
Years in Dubai
400+
Projects Delivered
4.9
Client rating
1
Studio, Fits all
Retail Fit Out Built to the Drawing, Not an Approximation of It
Fixture placement, lighting positions and signage all get built to the approved layout as issued, whether it’s a bespoke design or a franchise standard from another market, so the finished store matches the drawing your brand actually signed off on.








Mall Management's Rules, Navigated Before They Become Delays
Service corridor access, delivery hours, and protecting shared walkways during construction all have to satisfy mall management before the fit out even starts, and most delays trace back to a contractor who found this out on day one instead of before signing the contract.
Every Week Closed Is Rent Paid on an Empty Unit
Rent runs from signing regardless of build progress, so the programme is built to hit your handover date, every trade sequenced by one team so nothing waits on nothing.




A Completed Retail Fit Out, Walked Through
A short walkthrough of one store, fully built and handed over.
Leading Retail Interior Design Projects Across Dubai
Meet Our Senior Interior Design Team at Enzo Interiors
An award winning interior design team with three decades in Dubai residential and commercial design, still personally involved in every project the studio takes on, from first sketch to final handover.
30 years in Dubai interior design
From early Emirates Hills villas to today's Dubai Hills and MBR City homes.
Personally involved in every project
Every project is reviewed and signed off before it reaches you.
Process, coverage and questions
Everything above is the shape of it. Here's the depth, for anyone who wants it.
Fixtures, lighting, signage and mall or landlord approvals, all under one contract. If you need the design itself first, that's retail interior design.
Yes, a real share of our retail fit out projects start with drawings we didn't produce, a franchise standard or another studio's design. We build to that specification exactly.
Yes, service corridor access, delivery hours and shared area protection are coordinated with mall management as part of the project, not left for you to navigate separately.
Yes, a full bill of quantities and tender pack, whether or not we end up executing the build.
Confirmed exactly after reviewing the drawings and a site visit, based on floor area, fixture scope and finish level. As an educational estimate, projects span a broad range depending on specification, never a fixed number quoted upfront.
A typical retail fit out runs five to ten weeks once design is approved, depending on floor area and fixture complexity.
Yes, a dedicated site supervisor tracks the build against the approved drawings and mall requirements throughout.
Yes, the programme is built to hit your handover date, since rent typically runs from the signing date regardless of construction progress.
That's retail renovation, working with what's already built rather than starting from an empty unit.
One firm, one turnkey contract, build and mall approvals handled together, three decades of Dubai design and build experience behind every project.
Retail Interior Design
Interior Design experts since 1995
Retail Renovation
Renovation experts since 1995
Contact Us
One company, accountable end to end
