Office Fit-out in Dubai

Office Fit Out, Category A to Category B

Category A is the base-build shell a landlord typically hands over, raised access flooring, suspended ceiling grid, basic mechanical and electrical. Category B is everything a tenant adds on top, partitions, branding, joinery, reception, cabling, the layer that actually makes the space usable and recognisably yours. Office fit out here means either stage, or both together, built from a design that’s already approved, ours or someone else’s. If that design still needs to happen first, that’s office interior design, a different starting point.

30+

Years in Dubai

400+

Projects Delivered

4.9

Client rating

1

Studio, Fits all

Built From Your Drawings, or Ours

A real share of the offices we build arrive with drawings we didn’t produce, an architect’s Category B package, another studio’s joinery details, or a tenant’s own approved layout. We build to that specification as issued, power, data and raised flooring routed and tested before it’s closed over, partitions and reception joinery installed to match exactly, structured cabling and signage built in rather than retrofitted after the ceiling’s already shut.

Office Fit Out Sequenced Around a Business That Doesn't Stop

Work gets phased by floor, by zone, or scheduled after hours and weekends, whatever keeps the fewest desks offline and live IT infrastructure protected throughout. A vacant shell can be built in one continuous sequence, an operating tenancy rarely can, so the programme gets built around your calendar first.

One Site Team, Every Trade Kept in Sequence

Electricians, joinery installers, cabling contractors and flooring crews all need to move through a space in a specific order, out of sequence and one trade ends up redoing another’s work. A single supervisor tracks that sequence throughout, catching conflicts on site rather than at handover, so the office you walk into is the one that was actually approved.

A Completed Office Fit-Out, Walked Through

A short walkthrough of one completed workspace, handed over and already in use.

Office Fit Out Projects, Delivered Across Dubai

Meet Our Senior Interior Design Team at Enzo Interiors

An award winning interior design team with three decades in Dubai residential and commercial design, still personally involved in every project the studio takes on, from first sketch to final handover.

30 years in Dubai interior design

From early Emirates Hills villas to today's Dubai Hills and MBR City homes.

Personally involved in every project

Every project is reviewed and signed off before it reaches you.

The details

Process, coverage and questions

Everything above is the shape of it. Here's the depth, for anyone who wants it.

Category A is the base-build shell, raised flooring, ceiling grid, basic MEP, usually delivered by the landlord or developer. Category B is everything a tenant adds on top to make the space usable, partitions, branding, joinery and cabling. We handle either stage, or both together.

Yes. A meaningful share of our office fit out projects start with drawings we didn't produce ourselves. We build to the approved design as specified.

Yes, a full bill of quantities and tender pack can be prepared whether or not we end up executing the build.

Often yes, phased by floor or zone, or scheduled around evenings and weekends where a section needs to go fully offline.

Often, yes. Most leases include a reinstatement obligation, requiring the space to be handed back to base-build or a defined condition at lease end, which shapes what gets built and how it's documented from day one.

Cost depends on floor area, whether the scope is Category A, Category B, or both, and how much is custom joinery versus ready made. As an educational estimate, projects span a broad range depending on specification, confirmed exactly after reviewing the drawings and a site visit, never a fixed number quoted upfront.

A typical Category B fit out runs six to twelve weeks once design is approved, longer where Category A base-build work is also part of the scope.

Yes. A dedicated site supervisor tracks the build against the approved drawings throughout, so issues are caught on site rather than at handover.

Yes, handled as its own scope. See office renovation in Dubai for refreshing an existing space rather than building out a new one.

Enzo Interiors manages the build from drawings to handover, Category A or Category B, including the landlord and lease conditions most fit out companies leave for the tenant to sort out. Three decades of Dubai design and build experience stand behind every project we take on.

Office Interior Design

Fit-out experts since 1995

Office Renovation

renovation experts since 1995

Contact Us

One company, accountable end to end