A Delayed Restaurant Opening Costs More Than the Fit Out Itself
Rent runs from signing, staff get hired before the doors open, and inventory ordered for opening week doesn’t keep if the date slips. Most delays don’t come from the design, they come from a fit out team that didn’t install the extraction, gas or grease trap correctly the first time, and now the inspection has to happen twice.
Enzo Interiors has built restaurants across Dubai since 1995, to a standard that clears inspection without a second visit.
30+
Years in Dubai
400+
Projects Delivered
4.9
Client rating
1
Studio, Fits all
Restaurant Fit Out Built to Pass Inspection the First Time
Extraction that’s specified on a drawing still has to be ducted, pressure tested and actually clear the kitchen’s air once it’s running, and a grease trap still has to be installed at the right capacity and location, not just marked on a plan. We build to the standard the inspector checks against, not just the standard the design describes.








Built From Your Design, Equipment and All
A lot of restaurant owners arrive with a bespoke design already finished, from a consultant, a franchise standard, or their own concept from another market, and just need it built and commissioned correctly. We build to the approved drawings as issued, and prepare a full bill of quantities for competitive bidding on request, whether or not we end up executing the work ourselves.
Gas Lines, Ductwork and Cold Storage, Installed and Tested
Gas connections get pressure tested before equipment goes live, extraction ductwork gets routed and sealed to actually perform at the capacity it was designed for, and walk-in refrigeration gets installed and commissioned before the first delivery arrives, not squeezed in around a finished kitchen.




A Completed Restaurant Fit Out, Walked Through
A short walkthrough of one restaurant, fully built, commissioned and handed over.
Leading Restaurant Fit Out Projects Across Dubai
Meet Our Senior Interior Design Team at Enzo Interiors
An award winning interior design team with three decades in Dubai residential and commercial design, still personally involved in every project the studio takes on, from first sketch to final handover.
30 years in Dubai interior design
From early Emirates Hills villas to today's Dubai Hills and MBR City homes.
Personally involved in every project
Every project is reviewed and signed off before it reaches you.
Process, coverage and questions
Everything above is the shape of it. Here's the depth, for anyone who wants it.
Design, restaurant interior design, is the concept, layout and kitchen workflow. Fit out is the physical build, kitchen equipment, extraction and finishes installed and tested to pass inspection. We offer both, together or separately.
Yes. A real share of our restaurant fit out projects start with drawings we didn't produce, an existing consultant's plan or a franchise standard. We build to that specification exactly.
Yes, all commissioned and pressure tested before equipment goes live, so the kitchen performs at the capacity it was designed for, not an approximation of it.
Yes, a full bill of quantities and tender pack can be prepared whether or not we end up executing the build.
Cost depends on floor area, kitchen equipment scope and finish level. As an educational estimate, projects span a broad range depending on specification, confirmed exactly after reviewing the drawings and a site visit, never a fixed number quoted upfront.
A typical restaurant fit out runs eight to fourteen weeks once design is approved, depending on kitchen equipment complexity and how much is custom built.
Yes, a dedicated site supervisor tracks the build against the approved drawings and inspection requirements throughout, so issues are caught on site rather than at the official inspection.
Yes, the programme is built to hit your handover date, since rent and staffing costs typically run from the signing date regardless of construction progress.
That's restaurant renovation, working with what's already built rather than starting from an empty unit.
This studio manages the build from drawings to commissioning, including inspection readiness most fit out firms leave for the client to discover on the day. Three decades of Dubai design and build experience stand behind every project we take on.
Restaurant Interior Design
Interior design experts since 1995
Restaurant Renovation
Renovation experts since 1995
Contact Us
One company, accountable end to end
